Mississippi River Toll bridge Dubuque Iowa, Preliminary Engineering Report, October 31, 1968

(1968) Mississippi River Toll bridge Dubuque Iowa, Preliminary Engineering Report, October 31, 1968. Transportation, Department of

[img]
Preview
PDF
bridge_location_revenue_traffic_studies_dubuque_1968_OCR_.pdf

File Size:36MB

Abstract

The report includes an analysis of alternate bridge locations, preliminary engineering studies, traffic and toll revenue estimates, preliminary project costs and an indication of project feasibility. Seven alternate bridge construction programs have been studied, the proposals which assume imposition of tolls on the present Julien Dubuque Bridge in conjunction with construction of two or more new crossings indicate considerably higher financial feasibility levels than those which assume the bridge will remain free.

Item Type: Departmental Report
Keywords: traffic, transportation, vehicles, traffic study, highway, toll bridge, planning, Iowa State Highway Commission
Subjects: Transportation
Transportation > Traffic Management
Transportation > Bridges and tunnels
Transportation > Motor vehicles
Transportation > Roads and highways
Transportation > Design and Construction
ID Code: 49511
Deposited By: Margaret Barr
Deposited On: 11 Jun 2024 16:27
Last Modified: 11 Jun 2024 16:27
URI: https://publications.iowa.gov/id/eprint/49511