(1991) Air Formed Arch Culvert Construction: Crawford County, Construction Reports, HR-314, 1991. Transportation, Department of
|
PDF
IADOT_HR_314_Air_Formed_Arch_Culvert_1991.pdf File Size:2MB |
Abstract
Iowa's secondary roads contain nearly 15,000 bridges which are less than 40 feet (12 m) in length. Many of these bridges were built several decades ago and need to be replaced. Box culvert construction has proven to be an adequate bridge replacement technique. Recently a new bridge replacement alternative, called the Air-0-Form method, has emerged which has several potential advantages over box culvert construction. This new technique uses inflated balloons as the interior form in the construction of an arch culvert. The objective of research project HR-314 was to construct an air formed arch culvert to determine the applicability of the Air-O-Form technique as a county bridge replacement alternative.
Item Type: | Departmental Report |
---|---|
Keywords: | Box culverts, Bridges and culverts, Secondary roads, Construction, Concrete arch culverts |
Subjects: | Transportation Transportation > Materials Transportation > Bridges and tunnels Transportation > Research Transportation > Design and Construction Transportation > Maintenance and preservation |
ID Code: | 21994 |
Deposited By: | Iowa DOT Library |
Deposited On: | 29 Apr 2016 18:28 |
Last Modified: | 29 Apr 2016 18:28 |
URI: | https://publications.iowa.gov/id/eprint/21994 |