Dense Concrete Layer as Top Course of Bridge Deck Construction, HR-502, 1990

(1990) Dense Concrete Layer as Top Course of Bridge Deck Construction, HR-502, 1990. Transportation, Department of

[img]
Preview
PDF
IADOT_hr502_Dense_Concrete_Layer_Top_Course_Bridge_Deck_Construction_1990.pdf

File Size:397kB

Abstract

The use of deicing salts in this part of the country is a necessity to remove ice from our bridges. The use of these salts has always been a problem since the chloride-ions penetrate the concrete and reach the steel and cause corrosion which eventually cause deterioration of both the steel and concrete. One method used to try to prevent this from happening was to apply a waterproof membrane to the concrete after it was placed. This method did help, but was not cost effective as the longevity of the membrane system was of relatively short duration. For this reason, this research project was initiated. After the original deck was placed a second layer of concrete about 1 1/2" thick was placed on top. Biennial evaluation of the decks included testing for delaminations and steel corrosion. Cores were also obtained for a chloride analysis. Testing and observations showed the two-layer bridge deck to be effective in preventing corrosion. Since the time this project was initiated, epoxy steel has been introduced and is a cost effective way to protect the steel from corrosion.

Item Type: Departmental Report
Keywords: Chlorides, Concrete bridges, Corrosion protection, Cost effectiveness, Deicing chemicals, Delamination, Epoxides
Subjects: Transportation > Pavements > Concrete
Transportation
Transportation > Materials
Transportation > Bridges and tunnels
Transportation > Economics, finance, and taxes
Transportation > Maintenance and preservation
ID Code: 17079
Deposited By: Iowa DOT Library
Deposited On: 04 Jun 2014 19:30
Last Modified: 15 Jan 2015 15:33