(1980) Des Moines Fleur Drive/Army Post Road Signal System Study, April 1980. Transportation, Department of
|
PDF
city_des_moines_fluer-army_post_road_signel_system_study_1978_OCR_.pdf File Size:30MB |
Abstract
This report summarizes a study undertaken by the City of Des Moines to determine the feasibility of providing coordinated traffic signal operation along Fleur Drive and along a portion of Army Post Road. The City was assisted during the conduct of the study by JHK & Associates through a project partially funded under the Governor's Highway Safety Program. The study procedures, findings, and recommendations are presented herein. This report is supplemented by supporting documentation, interim technical reports, and an implementation plan including preliminary construction bid documents that were delivered to the City separately.
Item Type: | Departmental Report |
---|---|
Keywords: | Transportation, Signal System Study, Des Moines Iowa, Fleur Drive, Army Post Road |
Subjects: | Transportation Transportation > Design and Construction Transportation > Maintenance and preservation |
ID Code: | 45378 |
Deposited By: | Margaret Barr |
Deposited On: | 01 Aug 2023 19:53 |
Last Modified: | 01 Aug 2023 19:53 |
URI: | https://publications.iowa.gov/id/eprint/45378 |