This publication is an environmental impact statement regarding a project for the construction of a four-to-six lane divided highway involving two major segments of roadway in Des Moines Iowa. The north-south segment would begin at the existing Harding Road and 19th Street overpasses of Interstate 235 and extend along the Harding Road corridor to Fleur Drive (approximately 1.5 miles). The east-west segment would intersect with the north-south segment near the Raccoon River and proceed to the east along the existing corridors of Market Street, Elm Street, Raccoon street and Scott Avenue (approximately 2.9 miles) to the end of the project in the vicinity of S.E. 14th Street (U.S. Highways 65 and 69). The project also includes connections to Fleur Drive, 15th Street, Indianola Avenue and E. 15th Street.

Item Type: Departmental Report
Keywords: Contributor(s): United States. Federal Highway Administration; Iowa. Highway Division; Des Moines (Iowa). Traffic and Transportation Department; Express highways -- Environmental aspects -- Iowa -- Des Moines | Highway planning - Iowa - Des Moines; Environmental impact analysis - Iowa - Des Moines
Subjects: Natural resources and environment > Environmental assessments
Transportation > Roads and highways
Transportation > Design and Construction
Transportation > Environment
ID Code: 45211
Deposited By: Pamela Rees
Deposited On: 11 Jul 2023 19:08
Last Modified: 11 Jul 2023 19:08
URI: https://publications.iowa.gov/id/eprint/45211