(1968) Des Moines River Toll Bridge Vincennes Iowa, Preliminary Engineering Report by the Iowa State Highway Commission, October 1968. Transportation, Department of
|
PDF
Bridge_location_revenue_traffic_studies_Vincennes_1968_OCR_.pdf File Size:3MB |
Abstract
Iowa State Highway Commission authorized preparation of a preliminary feasibility report for a proposed new toll bridge near Vincennes. This report is one of several comparable bridge studies to be conducted as part of the Iowa Toll Bridge Program, in accordance with legislation enacted by the Iowa General Assembly, a copy of which is included in the Appendix. The various locations in southeastern Iowa.
Item Type: | Departmental Report |
---|---|
Keywords: | traffic, transportation, vehicles, traffic study, highway, toll bridge, planning, Iowa State Highway Commission |
Subjects: | Transportation Transportation > Traffic Management Transportation > Bridges and tunnels Transportation > Motor vehicles Transportation > Roads and highways Transportation > Design and Construction |
ID Code: | 45178 |
Deposited By: | Margaret Barr |
Deposited On: | 07 Jul 2023 19:47 |
Last Modified: | 07 Jul 2023 19:47 |
URI: | https://publications.iowa.gov/id/eprint/45178 |