Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects, RB07-013, 2015

(2015) Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects, RB07-013, 2015. Transportation, Department of

[img]
Preview
PDF
IADOT_InTrans_RB07_013_Lab_Investigation_Grouted_Coupler_Connection_Details_ABC_Bridge_Projects_Final_2015.pdf

File Size:5MB
[img]
Preview
PDF
IADOT_InTrans_RB07_013_Investigation_Grouted_Coupler_Connection_Details_ABC_Bridge_Projects_Summary_2015.pdf

File Size:1MB

Abstract

With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.

Item Type: Departmental Report
Note: This record contains 2 files: the full 51 page report and the 3 page Tech Transfer Summary. The summary is not deposited separately.
Keywords: Bridge construction; Bridge design; Couplers; Laboratory tests; Precast concrete; Static loads; Structural connection; accelerated bridge construction; ABC connection details; accelerated bridge construction; chloride penetration testing; fatigue load testing; grouted coupler connections; Keg Creek Bridge; precast concrete bridges; static load testing
Subjects: Transportation
Transportation > Materials
Transportation > Bridges and tunnels
Transportation > Design and Construction