Blended Cement Patching Research, MLR-04-01, 2005

(2005) Blended Cement Patching Research, MLR-04-01, 2005. Transportation, Department of

[img]
Preview
PDF
IADOT_mlr_04_01_Blended_Cement_Patching_Research_2005.pdf

File Size:221kB

Abstract

With the recent introduction of blended cements, many ready mix producers are using them as their sole source of cement. Iowa DOT specifications currently do not allow blended cements in patching due to their assumed slower strength gain. Patching specifications require opening at 5 hours on 2-lane or 10 hours on 4-lane pavement. This research will investigate early strength of concrete cast with ordinary Type I/II Portland cements and Type I(SM) blended Portland cements.

Item Type: Departmental Report
Keywords: Blending, Cast in place concrete, Concrete mixing, Patching, Portland cement concrete
Subjects: Transportation > Pavements
Transportation > Pavements > Concrete
Transportation
Transportation > Materials
Transportation > Research
Transportation > Design and Construction
Transportation > Maintenance and preservation
ID Code: 19907
Deposited By: Iowa DOT Library
Deposited On: 24 Jun 2015 17:04
Last Modified: 24 Jun 2015 17:04
URI: https://publications.iowa.gov/id/eprint/19907