(1975) Ultimate Load Behavior of Full-Scale Highway Truss Bridges, Summary Report, HR-169, 1975. Transportation, Department of
|
PDF
IADOT_hr169summary_Ultimate_Load_Behavior_Full_Scale_Hwy_Trss_Brid_1975.pdf File Size:2MB |
Abstract
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pin-connected, high-truss, single-lane bridge, was selected for a comprehensive testing program which included ultimate load tests, service load tests, and a supplementary test program. A second bridge was used for a limited service load test program. The results of the research are detailed in two interim reports. The first interim report outlines the ultimate load tests and the second interim report details the results of the service load and supplementary test program. This report presents a summary of these findings along with recommendations for implementation of the findings.
Item Type: | Departmental Report |
---|---|
Keywords: | Bridges, Fatigue tests, Field tests, Highway bridges, Iron, Static and dynamic tests, Steel, Timber, Trusses |
Subjects: | Transportation Transportation > Bridges and tunnels Transportation > Roads and highways Transportation > Research Transportation > Design and Construction |
ID Code: | 17307 |
Deposited By: | Iowa DOT Library |
Deposited On: | 01 Jul 2014 11:35 |
Last Modified: | 29 Jan 2015 18:53 |
URI: | https://publications.iowa.gov/id/eprint/17307 |