Evaluation of the Bettendorf Bridge, Iowa, Final Report, July 2006

(2006) Evaluation of the Bettendorf Bridge, Iowa, Final Report, July 2006. Transportation, Department of

[img]
Preview
PDF
Final_Copy_Bettendorf_Report.pdf

File Size:2MB

Abstract

The objective of this study was to evaluate the structural performance of a bridge constructed with FRP deck panels that carries the 53rd Avenue extension over Crow Creek in Bettendorf, Iowa. To assess how the FRP panel deck behaves under actual bridge loading, field data were obtained from a long-term monitoring system and two short-term live load tests. This report summarizes the instrumentation, the test protocols, and the test results from this study. In addition and where applicable, the test results are compared with measured conventional-deck field behavior and empirical design assumptions.

Item Type: Departmental Report
Keywords: Bettendorf, Iowa, bridges, transportation
Subjects: Transportation
Transportation > Bridges and tunnels
Transportation > Roads and highways
ID Code: 51939
Deposited By: Margaret Barr
Deposited On: 04 Feb 2025 21:40
Last Modified: 04 Feb 2025 21:40
URI: https://publications.iowa.gov/id/eprint/51939