(2004) Monitoring of the Launches Girder Bridge over the Iowa River on US 20, March 2004. Transportation, Department of
|
PDF
irb_paper.pdf File Size:4MB |
Abstract
The objective of the study presented in this report was to document the launch of the Iowa River Bridge and to monitor and evaluate the structural performance of the bridge superstructure and substructure during the launch. The Iowa Department of Transportation used an incremental launching method, which is relatively unique for steel I-girder bridges, to construct the Iowa River Bridge over an environmentally sensitive river valley in central Iowa.
Item Type: | Departmental Report |
---|---|
Keywords: | Design, Construction, Concrete, Bridges, Girder, Transportation, Iowa River, Iowa River Bridge, Steel |
Subjects: | Transportation > Bridges and tunnels Transportation > Research > Concrete Transportation > Research Transportation Transportation > Design and Construction |
ID Code: | 51931 |
Deposited By: | Margaret Barr |
Deposited On: | 04 Feb 2025 20:12 |
Last Modified: | 04 Feb 2025 20:12 |
URI: | https://publications.iowa.gov/id/eprint/51931 |