Mississippi River Toll Bridge Fort Madison Iowa, Preliminary Engineering Report by the Iowa State Highway Commission, August 1968

(1968) Mississippi River Toll Bridge Fort Madison Iowa, Preliminary Engineering Report by the Iowa State Highway Commission, August 1968. Transportation, Department of

[img]
Preview
PDF
Bridge_location_revenue_traffic_studies_fort_madison_1968_OCR_.pdf

File Size:4MB

Abstract

Iowa State Highway Commission authorized preparation of a preliminary feasibility report for a proposed new toll bridge at Fort Madison. This report is one of several comparable bridge studies to be conducted as part of the Iowa Toll Bridge Program, in accordance with legislation enacted by the Iowa General Assembly. The various locations along the Mississippi River.

Item Type: Departmental Report
Keywords: traffic, transportation, vehicles, traffic study, highway, toll bridge, planning, Iowa State Highway Commission
Subjects: Transportation
Transportation > Traffic Management
Transportation > Bridges and tunnels
Transportation > Motor vehicles
Transportation > Roads and highways
Transportation > Design and Construction
ID Code: 45180
Deposited By: Margaret Barr
Deposited On: 07 Jul 2023 20:05
Last Modified: 07 Jul 2023 20:05
URI: https://publications.iowa.gov/id/eprint/45180