(2013) Final Report (SPR Project 90-00-RB10-012) on the Maintenance Asset Management Project Phase II, 2013. Transportation, Department of
|
PDF
IADOT_RB10_012_Blaesing_Thompson_SPR_Maintenance_Management_Report_Phase_II_Contract13479v3p2_2012.pdf File Size:484kB |
Abstract
This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.
Item Type: | Departmental Report |
---|---|
Keywords: | Asset management, Computer aided design, Culverts, Data collection, Databases, Field studies, Geographic information systems, Global Positioning System, Guardrails, Handheld computers, Inspection, Maintenance, Signs, Technology |
Subjects: | Transportation Transportation > Data and Information Technology Transportation > Education Transportation > Maintenance and preservation |
ID Code: | 20584 |
Deposited By: | Leighton Christiansen |
Deposited On: | 29 Oct 2015 14:52 |
Last Modified: | 29 Oct 2015 14:52 |
URI: | https://publications.iowa.gov/id/eprint/20584 |