(2005) Blended Cement Patching Research, MLR-04-01, 2005. Transportation, Department of
|
PDF
IADOT_mlr_04_01_Blended_Cement_Patching_Research_2005.pdf File Size:221kB |
Abstract
With the recent introduction of blended cements, many ready mix producers are using them as their sole source of cement. Iowa DOT specifications currently do not allow blended cements in patching due to their assumed slower strength gain. Patching specifications require opening at 5 hours on 2-lane or 10 hours on 4-lane pavement. This research will investigate early strength of concrete cast with ordinary Type I/II Portland cements and Type I(SM) blended Portland cements.
Item Type: | Departmental Report |
---|---|
Keywords: | Blending, Cast in place concrete, Concrete mixing, Patching, Portland cement concrete |
Subjects: | Transportation > Pavements Transportation > Pavements > Concrete Transportation Transportation > Materials Transportation > Research Transportation > Design and Construction Transportation > Maintenance and preservation |
ID Code: | 19907 |
Deposited By: | Iowa DOT Library |
Deposited On: | 24 Jun 2015 17:04 |
Last Modified: | 24 Jun 2015 17:04 |
URI: | https://publications.iowa.gov/id/eprint/19907 |