Construction of the Iowa Highway 60 Precast Prestressed Concrete Pavement Bridge Approach Slab Demonstration Project, HR-1085, 2007

(2007) Construction of the Iowa Highway 60 Precast Prestressed Concrete Pavement Bridge Approach Slab Demonstration Project, HR-1085, 2007. Transportation, Department of

[img]
Preview
PDF
IADOT_hr_1085_Construction_IA_Highway_60_Precast_Prestressed_Concrete_Bridge_2007.pdf

File Size:9MB

Abstract

Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.

Item Type: Departmental Report
Keywords: Bridge approaches, Bridge design, Bridges, Prestressed concrete bridges, Prestressed concrete pavements, Reconstruction
Subjects: Transportation
Transportation > Bridges and tunnels
Transportation > Roads and highways
Transportation > Design and Construction