(1974) Economic Analysis of Advance 4-Lane Right of Way Acquisition, October 8, 1974. Transportation, Department of
|
PDF
Econmics_analysis_advance_4_lane_right_of_way_1974_OCR_.pdf File Size:4MB |
Abstract
This study's purpose is to analyze the land cost per acre incurred by the public in the advance purchase of 4-lane Right of Way when only 2-lane Right of Way is initially required. The holding period for the study is assumed to be from 5 to 20 years. The past and projected increase in Iowa farmland prices are then discussed as well a s considerations regarding the economic and social costs of 4-lane advance acquisition.
Item Type: | Newsletter |
---|---|
Keywords: | Four lane Roads, transportation, DOT, Iowa, roads, cost per acre, Right of Way, |
Subjects: | Transportation > Research Transportation > Roads and highways Transportation > Design and Construction Transportation |
ID Code: | 44972 |
Deposited By: | Margaret Barr |
Deposited On: | 27 Jun 2023 19:21 |
Last Modified: | 27 Jun 2023 19:21 |
URI: | https://publications.iowa.gov/id/eprint/44972 |