(2004) Portland Cement Concrete Patching Techniques vs. Performance and Traffic Delay, January 2004. Iowa State University
|
PDF
patching.pdf File Size:1MB |
Abstract
Standards for the construction of full-depth patching in portland cement concrete pavement usually require replacement of all deteriorated based materials with crushed stone, up to the bottom of the existing pavement layer. In an effort to reduce the time of patch construction and costs, the Iowa Department of Transportation and the Department of Civil, Construction and Environmental Engineering at Iowa State University studied the use of extra concrete depth as an option for base construction. This report compares the impact of additional concrete patching material depth on rate of strength gain, potential for early opening to traffic, patching costs, and long-term patch performance. This report also compares those characteristics in terms of early setting and standard concrete mixes. The results have the potential to change the method of Portland cement concrete pavement patch construction in Iowa.
Item Type: | Departmental Report |
---|---|
Keywords: | early opening to traffic—patch depth—patch strength gain—portland cement concrete pavement patching |
Subjects: | Transportation Transportation > Research > Concrete Transportation > Roads and highways Transportation > Design and Construction Transportation > Research |
ID Code: | 2887 |
Deposited By: | Margaret Barr |
Deposited On: | 24 Oct 2005 |
Last Modified: | 24 Oct 2005 |
URI: | https://publications.iowa.gov/id/eprint/2887 |