U.S. Highway 20 Corridor Development Study, Report B: Improvement Alternatives, Costs and Traffic, 1992

(1992) U.S. Highway 20 Corridor Development Study, Report B: Improvement Alternatives, Costs and Traffic, 1992. Transportation, Department of

[img]
Preview
PDF
IADOT_US_Highway_20_Development_Report_B_1992.pdf

File Size:3MB

Abstract

In February the U.S. 20 Corridor Development Study's Steering Committee met to review Report A. At that meeting the Committee selected seven alternatives to be evaluated from a cost and traffic perspective. This report, Report B, presents the cost and traffic evaluation of these seven alternatives. This Report B and its cost and traffic estimates will be reviewed at the next Steering Committee meeting. At that time it is possible that, based on the traffic and cost estimates, one or more of the alternatives will be eliminated from further consideration. After that meeting the Consultant will initiate the more in-depth analyses, including the economic feasibility

Item Type: Departmental Report
Keywords: Alternatives analysis, Cost estimating, Costs, Feasibility analysis, Traffic estimation, Rural highways
Subjects: Transportation
Transportation > Traffic Management
Transportation > Roads and highways
Transportation > Research
Transportation > Design and Construction
Transportation > Economics, finance, and taxes
ID Code: 22490
Deposited By: Iowa DOT Library
Deposited On: 26 Jul 2016 12:38
Last Modified: 26 Jul 2016 12:38
URI: https://publications.iowa.gov/id/eprint/22490