(2006) Concrete Pavement Construction Basics, June 2006. Transportation, Department of
|
PDF
ConstructionBasicsTechNote_000.pdf File Size:1MB |
Abstract
General principles • Everyone at the construction site, particularly foremen and supervisors, is responsible for recognizing and troubleshooting potential problems as they arise. • Batches of concrete should be consistent and uniformly mixed. • A major cause of pavement failure is unstable subgrade. The subgrade should consist of uniform material, and the subgrade system must drain well. • Dowel bars are important for load transfer at transverse joints on pavements with high truck volumes. Dowels must be carefully aligned, horizontally and vertically, to prevent pavement damage at the joints. • Stringlines control the slipform paver’s horizontal and vertical movement and ensure a smooth pavement profile. Once stringlines are set, they should be checked often and not disturbed. • Overfinishing the new pavement and/or adding water to the surface can lead to pavement surface problems. If the concrete isn’t sufficiently workable, crews should contact the project manager. Changes to the mixture or to paver equipment may reduce the problem. • Proper curing is critical to preventing pavement damage from rapid moisture loss at the pavement surface. • A well spaced and constructed system of joints is critical to prevent random cracking. • Joints are simply controlled cracks. They must be sawed during the brief time after the pavement has gained enough strength to prevent raveling but before it begins to crack randomly (the “sawing window”). • Seasonal and daily weather variations affect setting time and other variables in new concrete. Construction operations should be adjusted appropriately.
Item Type: | Newsletter |
---|---|
Keywords: | Highway, Concrete Pavement Construction, Transportation |
Subjects: | Transportation > Research Transportation > Research > Concrete Transportation > Roads and highways Transportation |
ID Code: | 13145 |
Deposited By: | Margaret Barr |
Deposited On: | 12 Jun 2012 16:46 |
Last Modified: | 12 Jun 2012 16:46 |
URI: | https://publications.iowa.gov/id/eprint/13145 |