(2010) Load Test to Assess Fatigue Detail Performance on Westbound I-80 Bridge over the Cedar River, February 8, 2010. Transportation, Department of
|
PDF
load_test_on_Westbound_I80_Cedar_River_rpt.pdf File Size:3MB |
Abstract
A the Cedar River in Iowa. There are twin bridges at the location with dimensions of 1172 ft x 30 ft (see Figure 1). The westbound bridge was to be demolished soon after the load test for the construction of a new bridge. The bridge is multi-stringer (redundant) with welded plate girders.
Item Type: | Departmental Report |
---|---|
Keywords: | Fatigue Design, Transportation, primary highway roads, plate girders |
Subjects: | Transportation Transportation > Materials Transportation > Research Transportation > Design and Construction |
ID Code: | 51935 |
Deposited By: | Margaret Barr |
Deposited On: | 04 Feb 2025 20:54 |
Last Modified: | 04 Feb 2025 20:54 |
URI: | https://publications.iowa.gov/id/eprint/51935 |