(2006) Drilled Shaft Load Testing I-235 over Union Pacific Railroad, January 5, 2006. Transportation, Department of
|
PDF
final_report_I235overUPRRDrilledShaft.pdf File Size:929kB |
Abstract
a research team from the Iowa State University Bridge Engineering Center performed a load test to document the behavior of a single drilled shaft foundation of the eastbound I-235 bridge over the Union Pacific Railroad. The test was performed on a closed roadway, using two loaded tandem dump trucks positioned directly above the shaft in question. This test was performed with the trucks in a static position and no attempt was made to collect data under moving load conditions.
Item Type: | Departmental Report |
---|---|
Keywords: | Bridges, Transportation, Shaft Load Testing, Union Pacific Railroad, I-235, |
Subjects: | Transportation Transportation > Bridges and tunnels Transportation > Roads and highways Transportation > Design and Construction |
ID Code: | 51930 |
Deposited By: | Margaret Barr |
Deposited On: | 04 Feb 2025 20:05 |
Last Modified: | 04 Feb 2025 20:05 |
URI: | https://publications.iowa.gov/id/eprint/51930 |