a research team from the Iowa State University Bridge Engineering Center performed a load test to document the behavior of a single drilled shaft foundation of the eastbound I-235 bridge over the Union Pacific Railroad. The test was performed on a closed roadway, using two loaded tandem dump trucks positioned directly above the shaft in question. This test was performed with the trucks in a static position and no attempt was made to collect data under moving load conditions.

Item Type: Departmental Report
Keywords: Bridges, Transportation, Shaft Load Testing, Union Pacific Railroad, I-235,
Subjects: Transportation
Transportation > Bridges and tunnels
Transportation > Roads and highways
Transportation > Design and Construction
ID Code: 51930
Deposited By: Margaret Barr
Deposited On: 04 Feb 2025 20:05
Last Modified: 04 Feb 2025 20:05
URI: https://publications.iowa.gov/id/eprint/51930