(1968) Muscatine Iowa Mississippi River Toll Bridge, Preliminary Engineering Report by the Iowa State Highway Commission, April1968. Transportation, Department of
|
PDF
Bridge_location_revenue_traffic_studies_Muscatine_1968_OCR_.pdf File Size:5MB |
Abstract
Iowa State Highway Commission authorized the preparation of a preliminary feasibility report for a proposed crossing in the Muscatine area. The report is one of several comparable bridge studies to be conducted as part of the Iowa Toll Bridge program, in accord with legislation enacted by the Iowa General Assembly. The various locations along the Mississippi River to be studied under this program are as shown on Exhibit 2, opposite page 1, with Muscatine Area set out in red as the subject of this report.
Item Type: | Departmental Report |
---|---|
Keywords: | traffic, transportation, vehicles, traffic study, highway, toll bridge, planning, Iowa State Highway Commission |
Subjects: | Transportation Transportation > Traffic Management Transportation > Bridges and tunnels Transportation > Motor vehicles Transportation > Roads and highways Transportation > Design and Construction |
ID Code: | 45184 |
Deposited By: | Margaret Barr |
Deposited On: | 07 Jul 2023 20:26 |
Last Modified: | 07 Jul 2023 20:28 |
URI: | https://publications.iowa.gov/id/eprint/45184 |