Interstate 380 Planning Study(PEL): Impact of Alternative Modes on Interstate 380 – Technical Memorandum, February 2018

(2018) Interstate 380 Planning Study(PEL): Impact of Alternative Modes on Interstate 380 – Technical Memorandum, February 2018. Transportation, Department of

[img]
Preview
PDF
I380-TechMemos-Alternative-Modes.pdf

File Size:12MB

Abstract

The purpose of this Impact of Alternative Modes on Interstate 380 Technical Memorandum developed by the Iowa Department of Transportation (Iowa DOT) is to examine the long-term potential for commuter rail and automated bus transit as a component of an enhanced multimodal transportation network for growing communities in the Iowa City-Cedar Rapids Corridor. The Technical Memorandum was developed concurrently with the broader Iowa DOT Interstate 380 Corridor Planning and Environmental Linkage Study (I-380 PEL Study) that evaluated safety, capacity, and infrastructure deficiencies on the principal roadway between the two cities and made recommendations for improvements to increase regional mobility in the near-term horizon.

Item Type: Departmental Report
Keywords: Interstate 380, Transportation, Highway Study, Planning Study, PEL
Subjects: Transportation
Transportation > Roads and highways
Transportation > Research
Transportation > Design and Construction
ID Code: 43110
Deposited By: Margaret Barr
Deposited On: 21 Feb 2023 15:54
Last Modified: 21 Feb 2023 15:54
URI: https://publications.iowa.gov/id/eprint/43110