(1996) A Continuous Span Aluminum Girder Concrete Deck Bridge - Part 1 of 2: Field Test Performance and Evaluation, 1996. Transportation, Department of
|
PDF
IADOT_CTRE_Continuous_Span_Aluminum_Girder_Concrete_Deck_Bridge_1996.pdf File Size:41MB |
Abstract
This report addresses the field testing and analysis of those results to establish the behavior of the original Clive Road Bridge that carried highway traffic over Interstate 80 (I-80) in the northwest region of Des Moines, Iowa. The bridge was load tested in 1959, shortly after its construction and in 1993, just prior to its demolition. This report presents some of the results from both field tests, finite element predictions of the behavior of aluminum bridge girders, and load distribution studies.
Item Type: | Departmental Report |
---|---|
Keywords: | Aluminum; Continuous girder bridges; Field tests; Finite element method; Forecasting; Girder bridges; Girders; Highway bridges; Load tests; Load transfer; Performance evaluations |
Subjects: | Transportation Transportation > Materials Transportation > Bridges and tunnels Transportation > Roads and highways Transportation > Design and Construction |