(2002) Total Maximum Daily Load for Siltation, Upper Pine Lake, Hardin County Iowa, December 2002. Natural Resources, Department of
|
PDF
upperpine.pdf File Size:1MB |
Abstract
The Federal Clean Water Act requires the development of a total maximum daily load (TMDL) for the pollutant(s) that causes a water body to be placed on the State of Iowa impaired waters list [303(d) list]. Upper Pine Lake is on the 1998 list because of an assessment that the lake only partially supports its aquatic life use as a consequence of siltation. The 1998 assessment report reiterates the 1994 and 1996 lake evaluations, the primary cause of impaired water quality is the high rate of siltation. This document consists of a single TMDL for siltation intended to provide water quality in Upper Pine Lake that fully supports its designated uses. Specifically, sediment delivery reduction has been targeted to address the siltation impairment.
Item Type: | Departmental Report |
---|---|
Keywords: | TMDL Siltation Upper Pine Lake |
Subjects: | Natural resources and environment > Water resources > Water quality |
ID Code: | 52342 |
Deposited By: | Mr Jamie Mootz |
Deposited On: | 28 Mar 2025 19:11 |
Last Modified: | 28 Mar 2025 19:11 |
URI: | https://publications.iowa.gov/id/eprint/52342 |