(1978) Final Negative Declaration for U.S. 151 Linn and Jones Counties from Iowa 13 Easterly to Iowa 1 prepared by Planning and Research Division and Office of Project Planning, 1978. Transportation, Department of
|
PDF
final_negative_declaration_1978_OCR_.pdf File Size:30MB |
Abstract
The proposed project involves the improvement of an approximate twelve-mile segment of U.S. 151 in Linn and Jones Counties from Iowa 13 to Iowa 1 (Figure 1). Proposed construction for this project commences east of Iowa 13 to permit relocation of the Iowa 13/U.S. 151 intersection as part of the future Marion Bypass project to the west. This proposed project extends easterly for about ten miles to just beyond the junction of Iowa 1 in Jones County. The proposed construction provides for a four-lane divided highway which would generally follow the present alignment of U.S. 151. This statement also studies a bypass to the south of the town of Springville.
Item Type: | Departmental Report |
---|---|
Keywords: | Environmental assessment, transportation |
Subjects: | Transportation Transportation > Roads and highways Transportation > Research |
ID Code: | 48686 |
Deposited By: | Margaret Barr |
Deposited On: | 19 Apr 2024 16:39 |
Last Modified: | 19 Apr 2024 16:39 |
URI: | https://publications.iowa.gov/id/eprint/48686 |