Duane Arnold Energy Center, Cedar River Operational Ecological Study, Annual Report, March 20, 1976

(1976) Duane Arnold Energy Center, Cedar River Operational Ecological Study, Annual Report, March 20, 1976. University of Iowa

[img]
Preview
PDF
ceadr_river_operational_eco_study_1976_OCR_.pdf

File Size:27MB

Abstract

This report presents the results of the physical, chemical and biological studies of the Cedar River in the vicinity of the Duane Arnold Energy Center during the second year of station operation. The Duane Arnold Energy Center Operational Study of the Cedar River was implemented in mid-January, 1974. Prior to plant start-up, extensive pre-operational data have been collected since April 1971. These pre-operational studies provided "base-line" data which have made it possible to assess the effects of station operation on the limnology and water quality of the Cedar River.

Item Type: Departmental Report
Keywords: Ecological Study, University of Iowa, biological studies, Cedar River
Subjects: Natural resources and environment
Natural resources and environment > Water resources
Natural resources and environment > Water resources > Rivers and streams
ID Code: 48681
Deposited By: Margaret Barr
Deposited On: 19 Apr 2024 15:57
Last Modified: 19 Apr 2024 15:57
URI: https://publications.iowa.gov/id/eprint/48681