07014-005 Maple River Watershed Final Report

(2012) 07014-005 Maple River Watershed Final Report. Agriculture and Land Stewardship

[img]
Preview
PDF
7014-005 Maple River Junction FINAL report.pdf

File Size:1MB

Abstract

The proposed project will include the construction of a sanitary sewer collection system and a community gravel filter wastewater treatment system in the unsewered community of Maple River Junction in Carroll County. The system will be built to include approximately 1,150 feet of 4-inch sanitary sewer main, 3,540 feet of 4-inch service main an approximately 35 septic tanks. Some existing 4-inch PVC sewer piping as well as existing septic tanks in good condition will continue to be used in order to control capital costs.

Item Type: Departmental Report
Keywords: Watershed Improvement Review Board, WIRB, Carroll Soil and Water Conservation District, Carroll County, South Raccoon
Subjects: Natural resources and environment > Water resources
Natural resources and environment > Water resources > Water quality
ID Code: 21296
Deposited By: Jerome Neppel
Deposited On: 24 Feb 2016 14:28
Last Modified: 24 Feb 2016 14:28
URI: https://publications.iowa.gov/id/eprint/21296