Incentive-Disincentive Clause, HR-521, 1985

(1985) Incentive-Disincentive Clause, HR-521, 1985. Transportation, Department of

[img]
Preview
PDF
IADOT_hr521_Incentive_Disincentive_Clause_1985.pdf

File Size:125kB

Abstract

There is an urgent need to complete projects in high traffic urban areas in the shortest possible time. These road user benefits resulting from faster construction will minimize public inconvenience, safety hazards and a total cost to the public. The incentive - disincentive clause in the contract will encourage the contractor to expedite all phases in the contract. A copy of this special provision is part of this work plan and other details of construction are included in the plan and specification of Project F-65-4(34)--20-77.

Item Type: Departmental Report
Keywords: Asphalt concrete, Density, Disincentives, Incentives, Prices, Specifications
Subjects: Transportation
Transportation > Materials
Transportation > Roads and highways
Transportation > Design and Construction
ID Code: 19728
Deposited By: Iowa DOT Library
Deposited On: 02 Jun 2015 18:02
Last Modified: 02 Jun 2015 18:02
URI: https://publications.iowa.gov/id/eprint/19728