(2012) US 30 Proposed Expansion Benton County, Iowa, Enviornmental Assessment and Section 4(f) De Minimis Impact Finding, June 11, 2012. Transportation, Department of
|
PDF
US_30_Benton_Co_Complete_EA_Jun_2012_to_FHWA.pdf File Size:6MB |
Abstract
The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.
Item Type: | Newsletter |
---|---|
Keywords: | US 30, Benton County, Envirnmental Assessment, Transportation |
Subjects: | Transportation > Research Transportation > Roads and highways Transportation > Design and Construction Transportation |
ID Code: | 13634 |
Deposited By: | Margaret Barr |
Deposited On: | 22 Aug 2012 17:47 |
Last Modified: | 22 Aug 2012 17:47 |