Water Supply Construction, Permitting Process Manual, January 2014

(2014) Water Supply Construction, Permitting Process Manual, January 2014. Natural Resources, Department of

[img]
Preview
PDF
ws_manual.pdf

File Size:221kB

Abstract

Issuing drinking water construction permits is the responsibility of the Iowa Department of Natural Resources (DNR), specifically the Water Supply Engineering Section. A public water supply construction permit must be obtained from DNR prior to the construction or modification of any source, treatment, storage or distribution system of a public water supply. When a city or county decides to initiate a drinking water project, many parties may become involved in the process,

Item Type: Departmental Report
Keywords: drinking water, construction, permits, water supply construction, public water
Subjects: Natural resources and environment
Natural resources and environment > Environmental assessments
ID Code: 49245
Deposited By: Margaret Barr
Deposited On: 28 May 2024 18:30
Last Modified: 28 May 2024 18:30
URI: https://publications.iowa.gov/id/eprint/49245