(2017) Open Feedlot Construction Permit Manual, July 7, 2017. Natural Resources, Department of
|
PDF
5421427 manual.pdf File Size:2MB |
Abstract
This guide was developed to assist producers, engineers, consultants and the DNR staff to understand the open feedlot construction permit process. Too many times applicants have been frustrated by long delays and a feeling of being “left in the dark.” Our goal is to foster communication between the involved parties and continually improve the permitting process. This manual outlines a new “fast track” open feedlot construction permit. It contains the information needed to progress through the new permit process, including flow charts, detailed descriptions of the steps in the process, and required forms and instructions. If at any time there are questions about the process, please contact the DNR Animal Feeding Operations.
Item Type: | Departmental Report |
---|---|
Keywords: | Natural Resources, Feedlot, Construction, Animal Feeding Operation |
Subjects: | Agriculture and food production Agriculture and food production > Livestock |
ID Code: | 33704 |
Deposited By: | Margaret Barr |
Deposited On: | 15 Sep 2020 19:51 |
Last Modified: | 15 Sep 2020 19:51 |
URI: | https://publications.iowa.gov/id/eprint/33704 |