(2020) Iowa Department of Natural Resources; Flood Plain Management Program Earth Embankment Dams, July 14, 2020. Natural Resources, Department of
|
PDF
5421015.pdf File Size:1MB |
Abstract
This document should be filled out when submitting a joint application for embankment dam construction. Dam construction applications can be submitted in two phases to ensure the project is on track for approval during the preliminary layout and studies of the dam site. The preliminary application packet includes filling out the online joint application form, providing the supplemental information required on this form and preliminary design data prepared by or under supervision of a qualified professional engineer licensed in the State of Iowa. The preliminary design data shall contain a report summarizing the preliminary design, hydrologic data and reservoir routing, a hazard potential analysis, preliminary design drawings, the soils and geotechnical engineering analysis and a list of the engineering references used as the basis for design and construction.
Item Type: | Departmental Report |
---|---|
Keywords: | Flood Plain, Leeves, DNR, Natural Resources |
Subjects: | Natural resources and environment Natural resources and environment > Water resources |
ID Code: | 33699 |
Deposited By: | Margaret Barr |
Deposited On: | 15 Sep 2020 18:39 |
Last Modified: | 15 Sep 2020 18:39 |
URI: | https://publications.iowa.gov/id/eprint/33699 |