05017-006 Lake Storm Lake Watershed Final Report

(2009) 05017-006 Lake Storm Lake Watershed Final Report. Agriculture and Land Stewardship

[img]
Preview
PDF
5017_006 Lake Storm Lake FINAL combined report.pdf

File Size:1MB

Abstract

This project will include the construction of four separate drainage and retention facilities to handle urban runoff that currently flows directly into Lake Storm Lake. These facilities will filter storm water from approximately 503 acres of urban land including two large industrial users Tyson Fresh Meats and Sara Lee Turkey Processing as well as other commercial and residential sections that currently go directly to the lake without filtration. Specifically the project involves the construction of a two cell dry bottomed detention pond system, construction of two rain gardens/bio retention areas, construction of rain gardens along storm water intakes on Highway 7, and construction of a porous rock detention area. The completed project will provide for cleaner water outleting to the fake in an area that has the largest potential for pollutants to enter the lake. This project is being done in conjunction with other watershed improvements including two additional rain gardens already in place and a multi-year dredging effort of Lake Storm Lake that will be starting its fifth year in 2006. Improvements in the rural water shed are also taking place with the help of a watershed coordinator. Some of these projects include buffer strips and filter slips along the waterways in the watershed.

Item Type: Departmental Report
Keywords: Watershed Improvement Review Board, WIRB, watershed, water quality, Lake Preservatlon Association, Buena Vista County
Subjects: Natural resources and environment > Water resources > Water quality
Natural resources and environment > Water resources > Watersheds
ID Code: 21352
Deposited By: Jerome Neppel
Deposited On: 22 Feb 2016 13:10
Last Modified: 22 Feb 2016 13:10
URI: https://publications.iowa.gov/id/eprint/21352